Hi,
To both members who are interested in the hoist,I first saw it in issue no 133,Christmas 2007.][Takes me a while to get around to things ]
Yes,I got around to your way of thinking also,regarding getting the table down to ground level. You would need to change the design somewhat,but it could be done,it,s food for thought ! I will take another few pictures although the only difference is that I have fitted gussets and stays,the rest is as I posted.
Regarding the rollers,no,I did not use bearings. Dave used old sash weights,I used 2" round and turned a slight taper on them,since I was using channel and the inside of that is tapered. I found that by setting the top slide off by 3 deg,that was enough to suit the profile of the channel. I think roller bearings would be an overkill for something like this,and the proof is that it works very well. This is not something which is going to be uses 24/7/365,so I consider it,s "Fit for purpose"
By posting this,in the first place,I learned a great deal,from comments and advice from other members. You should bear all this in mind when you begin your build. I would be a lot wiser second time around.
There is plenty of room here for development. I may not go that rout since I am happy enough with what I have,but there,s no need for anyone else to stop here,that,s what it,s all about !
I look forward to see what comes out of all this.