Hi all. a while ago I posted my traumas with my GLR vertical boiler silver soldering.
Well after a few nervous reheatings my intitial leak test is good.
This was at just a few psi of air not the full blown hydraulic pressure test.
Ironically the only leak I had was back out of the check valve which I had fitted with an adaptor to take a tyre connector. Tried cleaning the ball and blowing out but air still bubbling out.
Now my question to you experts is this.
Is the valve faulty / will it 'bed in' / does it need some work on it to bed it in/ or is this to be expected on air as presumably it is designed to retain hydraulic pressure.
Regards
Bill D.