£1.5 million, not £15 million. Still a lot of beans to you and me.
That AI summary contains no useful info with regard to failure mode so I’m sticking with my diagnosis of a bound up top pivot. The design relied on the mass of the bridge being correctly distributed to keep the teeth engaged so a bit of unexpected rotational torque would upset that.
I am not a civil or structural engineer.