My Emma Victoria – oops

My Emma Victoria – oops

Home Forums Locomotives My Emma Victoria – oops

Viewing 7 posts - 1 through 7 (of 7 total)
  • Author
    Posts
  • #247053
    Bill Dawes
    Participant
      @billdawes

      Thought I was going well with manufacture and dry assembly of boiler until I came to try the water and blower pipes that pass over the firebox and they would not. Found that I had allowed a bit more length on the endplates (4 13/16 rather than 4 5/8&quot thinking I would trim it off later, forgot about it and measured centre distance for the firehole ring etc up from the bottom edge resulting in it sitting too high.

      One of these 'I could have kicked myself' moments, stopping to think about it before measuring and drilling may have avoided the problem.

      Bill D.

      #1536
      Bill Dawes
      Participant
        @billdawes
        #247063
        Jeff Dayman
        Participant
          @jeffdayman43397

          Hi Bill,

          Any chance of using smaller dia pipes?

          Or squashing down the pipes you have a bit?

          Or routing them at the side of the box , or somewhere else?

          Just some food for thought, sorry you've had the OOPS. Good luck with fixing it. JD

          #247070
          duncan webster 1
          Participant
            @duncanwebster1

            If it's dry assembled (ie not silver soldered) can't you patch the firebox backplate and re-machine the hole?

            #247295
            Bill Dawes
            Participant
              @billdawes

              I did think of all sorts of ways round it, but having found some copper sheet I had left over decided to do the job properly and make them again.

              I usually regret not doing this when I try to do a shortcut round a problem. Hopefully teach me to be more careful in future (but not banking on it)

              Bill D

              #247296
              julian atkins
              Participant
                @julianatkins58923

                Hi Bill,

                Do not attempt to cut out the firehole ring in the backhead until the inner firebox has been completed and crown girder stays silver soldered to the outer wrapper.

                Glad to hear you have a solution via more copper plate.

                Cheers,

                Julian

                #247667
                Bill Dawes
                Participant
                  @billdawes

                  That's another woops then Julian.

                  Bill D.

                Viewing 7 posts - 1 through 7 (of 7 total)
                • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

                Latest Replies

                Home Forums Locomotives Topics

                Viewing 25 topics - 1 through 25 (of 25 total)
                Viewing 25 topics - 1 through 25 (of 25 total)

                View full reply list.