I'd say the bit on the right is for a horizontal boiler maybe a scotch one as the group of holes would be under the dome.
The other two are a vertical, if that tube plate is not vet soldered then it should go in just above the firehole and the one on the left at the top
Edited By JasonB on 09/08/2019 13:25:31