Local company contacted me last week as they had heard on the local grapevine that I was downsizing with the result that they paid a visit and after 10 minutes of horse trading they bough the whole stock of steel, brass, alloy, stainless and all the spare sheet and profile that was so handy to fabricate bits out of.
They also bought the power saw and three of the welders.
So on Monday two guys rolled up with a long bed Transit pickup and loaded the first lot, or rather overloaded the first lot 
Problem is you can't see where they have been. I reckoned on about 4 tonnes but this first load had to be well over a tonne so not sure now just what was there.
So when they are finished that will be every bit of steel and alloy off the premises except for some oddment in a couple of drawers.
Edited By John Stevenson on 27/06/2017 12:36:13