fire box stay’s

fire box stay’s

Home Forums General Questions fire box stay’s

Viewing 8 posts - 1 through 8 (of 8 total)
  • Author
    Posts
  • #341962
    Kevin Bennett
    Participant
      @kevinbennett25223

      Hi a silly question with 5" Tich fire box boiler stay's do they need to be thread and screwed in then silver soldered in or the copper rivets located with a good fit then silver soldered.

      I have googled photos and it looks like a mix of screwed and held in place with a spring washer then soldered what is the best way to go about this.

      thanks Kevin

      #25817
      Kevin Bennett
      Participant
        @kevinbennett25223
        #342038
        Weary
        Participant
          @weary

          Copper rivets silver-soldered into position is the current preferred option. Screwed and nutted stays were preferred at the period when LBSC was writing as it allowed the use of (relatively) high-temperature solder ('Comsol' ) as a sealant in the event of leaks.

          Suggest that heads are placed on inside of firebox, small countersink on outside of structure on side where heat is to be applied where stem of rivet is to be silver-soldered. I would not make the fit 'good' with no qualification as you write, as you need to allow the sliver solder to flow along the stem of the rivet through the hole. Of course one man's 'good fit' is another's 'rattling good fit' in the world of model engineering! A couple of 'nicks' made with a file around the good fit hole will allow silver-solder flow to both sides of the stay. Basically you want a ring of silver-solder on both sides of the structure where the rivet passes through after silver-soldering.

          Cut excess length of rivets when boiler tested and thus all silver soldering fully completed.

           

          Regards,

          Phil

          Edited By Weary on 18/02/2018 08:52:22

          #342041
          J Hancock
          Participant
            @jhancock95746

            I seriously hope you haven't fixed the firebox and/or the boiler backhead in place yet ?

            #342046
            Kevin Bennett
            Participant
              @kevinbennett25223

              Hi thanks for the information all I have done is a dry fit on all the boiler parts next job is to make sure I have enough gas thanks

              thanks again Kevin

              #342293
              duncan webster 1
              Participant
                @duncanwebster1

                Leave the rivets well over length so you can get some heat into them, then cut off after pressure test. If you can't get long enough rivets you can use bronze bar. I've seen it recommended that a nick from a chisel can be used to stop them falling through, which is all the head is doing on a rivet actually, the silver solder gives it all the strength it needs

                #342305
                nigel jones 5
                Participant
                  @nigeljones5

                  To add to Duncans good advice, leave them long if you are using a 'big' propane type torch, if you happen to be using an oxy fueled torch they need to be short or they heat up much quicker than the surrounding metal, boil the solder and burn out the flux. An alternative to a chisel nick and the method I use is to give them a squeeze in the vice, right on the end, works a treat! Good luck.

                  #342307
                  KWIL
                  Participant
                    @kwil

                    The advantage of the rivet head on the inside, it affords some added protection to the silver solder joint from the products of coal combustion.

                  Viewing 8 posts - 1 through 8 (of 8 total)
                  • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

                  Latest Replies

                  Home Forums General Questions Topics

                  Viewing 25 topics - 1 through 25 (of 25 total)
                  Viewing 25 topics - 1 through 25 (of 25 total)

                  View full reply list.