I was intending to investigate this question at the Harrogate Show but the closure of the camping area at the show-ground (Why?!) and the cost of fuel has led me to cancel the trip.
What is the generally accepted way of joining the cab and integral side-tanks to the runner-boards on a 31/2″ loco? I have fitted brass angle along the base of the cab area and at the leading end of the side tanks and it is clear that attaching it along their length will pull the running boards nice and straight.
Is it usual to screw the parts together with nuts under the boards or rivet the four parts (2 x boards + 2 x sides) together permanently ?
of course if I rivet I will have to paint or at least prime the parts before fixing.
I can’t really wait until the Midlands Show in October to look at other engines to find the best alternative!
Tony