Options for your rims are:
Find some suitable thick wall tube and machine from that if you can swing 12" on the lathe.
Turn from 12" dia bar, the front rims can be trepanned out so you won't be wasting all the metal in the middle, need to swing 12"
Make from two "Tees" which could be flame or laser cut from plate, again need to be able to swing 12". The originals were two tees and the strakes held them together with possibly some additional plates or a band on the inside.
Have two strips of 3mm steel rolled and weld it into the outer rim, get some more 3mm material laser or plasma cut into flat rings and weld into the rims, this is usual practice for the larger models. No lathe work needed but you need to be able to weld or get them done by someone like Ashbys.
Use the cast ones from Blackgates that need turning
Use the cast Fowler ones from MJ Engineering which are finish cast so no turning needed.
I would suggest the easier front wheels first, a lot easier to get at the rivits, simpler to bend spokes as they are all the same.
As I said by message get the boiler design sorted before you start bying or cutting metal, no point in making formers until you know what thickness metal you will be working with.
Most people tend to build the front end first as that is not dependant on boiler on most designs, so thats smokebox, chimney, perch bracket, axle.
Edited By JasonB on 10/01/2017 07:37:05