      Once you as the customer accept delivery of a certified material with its relevant material certificate, then you cut the material and make the relevant parts for your boiler construction, the chain of traceability can be frustrated if you are making parts from more than one piece of copper and different material certificates apply to each piece of copper used. At best, unless you record which batch of material each part is made from and I doubt that as model engineers we are going to those lengths, then the traceability has been lost and the only surety is that you can quote that all material used was of the relevant material specification but in the event of any failure it is not possible to trace a fault to a specific certified batch of material. In industry, and I have worked on components that are used in nuclear engineering situations, traceability of all materials, via an accredited quality system, is required such that faulty material has to be traceable back to the casting process, to expect this with a model engineering boiler is in practical terms not possible as the end users I.e. the model engineers, do not have a recognised quality system and appropriate regulation, therefore any legal processes would unfortunately rest with the boiler constructors.

      Dave W

      #423060
      Baz
      Participant
        @baz89810

        So you buy your copper etc from your reputable supplier and get a copy of the mill cert, fine, but now can you as joe bloggs, model engineer prove that this new material is kept segregated from your stock of odds and ends and not just chucked on the bench with all the other bits of silver solder, copper tube and sheet etc. To prove this you would need a quality system and manual and need robust procedures in place for incoming material, a quarantine area and a bonded store. You would also have to have your system audited, by who I do not know, the bottom line is that most steel boilers are professionally made and come with paperwork, copper boilers professionally made will have paperwork but home made, you can prove you purchased the material but you cannot prove that you used it.

        #423064
        Martin Kyte
        Participant
          @martinkyte99762

          Isn't this getting a little silly. The system in place works. Boilers are not blowing up all over the place and it's affordable. Traceability is not required. If one boiler goes pop the rest of the fleet will not have to be grounded so each boiler is treated seperately and you don't need to know what batch of material each bit came from. I would suspect that all boilers finally end their days either leaking beyond reasonable use or by failing their periodic pressure test. The fact that you are going to sit with the boiler pretty much between your legs is sufficient cause to generate a reasonable degree of caution. )

          Martin

          #423069
          Samsaranda
          Participant
            @samsaranda

            Martin, I think the discussion progressed the way it did because the original poster questioned material certification linking this to legal liabilities and was unsure how the process worked in respect of home built boilers, the system, such as it is, works and we are all relatively safe from hordes of exploding boilers.

            Dave W

            #423074
            Former Member
            Participant
              @formermember19781

              [This posting has been removed]

              #423077
              Martin Kyte
              Participant
                @martinkyte99762

                No that isn't a silly question at all which is concerned with getting a boiler past the boiler inspectors.

                When the thread heads for the realms of military and aerospace traceability I would say it is getting a little silly. Generally threads stay mostly around things that are practically helpful and I for one tend to pick up many usefull things from them. I was merely saying that the thread seemed to be getting a little fancifull.

                It would be helpfull to know the answer to this but if you re making a boiler yourself maybe the better route would be to involve your club boiler inspector when you start and at strategic points along the way. That way you can ask if they are happy with the material/process/design mods etc as you go and will be in a position to act accordingly if something different is required. If I was a boiler inspector I'm sure I would be happier to work that way rather than be presented with a done deal.

                As far as commercial boilers are concerned mine has a CE mark which shows it conforms.

                regards Martin

                Edited By Martin Kyte on 07/08/2019 16:25:03

                #423087
                Baz
                Participant
                  @baz89810

                  Martin, 34046, yes this is getting totally silly, the trouble is that a lot of boiler inspectors make up their own rules on top of what the Southern, Northern fed state in their book. In my previous post I tried, perhaps not very well to illustrate that any traceability ends when raw material goes into your workshop, I would love someone to tell me where in the rule book traceability for copper boilers is mentioned. As for all this involving boiler inspectors, if you are building a boiler to a previously published design, say for instance a Simplex, the design has been around long enough to prove its safety and apart from perhaps showing your chosen inspector your flanged plates and firebox assembly, that in my humble opinion is all they would need to see, they are not gods, they don’t have x Ray eyes to examine penetration, the proof of the pudding is in the 2x hydraulic test, if it passes, jobs a good un, if it leaks like a sieve, weigh it in for scrap, learn from it and try again. If you are designing your own boiler, how many club boiler inspectors are competent enough, or would want to get involved?

                  #423089
                  Brian H
                  Participant
                    @brianh50089

                    I've designed a couple of boilers in the past and I had all the calculations ready to present to the inspectors at the initial pressure test. No problem with getting the complete set of tests done with the subsequent issue of a boiler certificate..

                    Brian

                    #423092
                    David Jupp
                    Participant
                      @davidjupp51506

                      It is simple enough to follow the principles of traceability if you choose to. Nobody said you have to have ISO 9000.

                      Commercial vessel builders can manage without ISO 9000 quality systems for even very high level pressure systems – just have inspection in place of an approved quality system. That doesn't sound so far from working with your club inspector and knowing what he/she expects to see.

                      #423118
                      Clive India
                      Participant
                        @cliveindia
                        Posted by Baz on 07/08/2019 16:52:39:

                        ……….. I would love someone to tell me where in the rule book traceability for copper boilers is mentioned. ……..

                        Can only find the following in Vol 1, 7.4, but maybe enough? Dunno! I'm not clever enough.

                        The Inspector shall satisfy himself:

                        a.That the materials used are of adequate thickness and the correct specification.

                        b.That, where required by the build procedure, the relevant material certificates are provided.

                        #423121
                        Samsaranda
                        Participant
                          @samsaranda

                          Clive, a and b seem to nail it if you are abiding by said volume.

                          Dave W

                          #423129
                          Phil H1
                          Participant
                            @philh196021

                            1. You try your best to buy the right copper and the right bronze – usually from a model suppliers.

                            2. Bronze definitely looks different to brass. I don't wish to bring sexism into this or be dismissive but my wife has zero technical training and she can tell the difference.

                            3. Quality assurance ISO 9000? – what bo****s!! Don't bother going there because the questions never stop e.g., how do you know the model supplier received the right stuff, have they sold the right stuff from the right pile and did you pick up the right bar when you did the machining? If you have the certificates – well done frame them but I have no idea how they will help.

                            Phil H

                            #423210
                            Nigel Graham 2
                            Participant
                              @nigelgraham2

                              Assuming we are talking about anything bigger than a Mamod boiler…

                              Forget all that analytical stuff. The MELG Guide Book (latest has a white cover with orange titles) tells you what you actually need to know.

                              It mentions certificates only for steel boilers, but places so many obstacles in their way that making a steel boiler is for the professional only, for all practical purposes.

                              (Curiously the original EU Pressure Equipment Regulations that our hobby sort of uses, mentions only two materials for pressure-vessels: aluminium-alloy and stainless-steel; but not which of a plethora of their alloys and grades!)

                              Copper and cuprous alloys, and silver-solders and fluxes – purchase by what it says on the drawings, and if you buy them from reputable suppliers they are what they say they are on the invoice. You don't need certificates of conformity for them, for amateur construction not by way of trade, and nor should your club's boiler-testers demand them, though they might want to inspect progress.

                              Just don't use brass in any structural component including the bushes for clacks etc. Rather according to alloy, it can become brittle in some circumstances and conditions.

                              The question mentions stainless-steel. I am afraid that is irrelevant. I think it's still ruled out, but anyway it comes in so many flavours with their own welding characteristics, that whilst there is no logical reason against stainless-steel boiler shells in principle, it is definitely a material for the professional boiler-makers able to choose the right alloy and weld it correctly.

                            Viewing 13 posts - 26 through 38 (of 38 total)
                            • Please log in to reply to this topic. Registering is free and easy using the links on the menu at the top of this page.

                            Latest Replies

                            Home Forums Beginners questions Topics

                            Viewing 25 topics - 1 through 25 (of 25 total)
                            Viewing 25 topics - 1 through 25 (of 25 total)

                            View full reply list.